• AWWA ACE54491

AWWA ACE54491

Estimating Future Capital Replacement Needs: An Innovative Case Study From the Central Arizona Project

American Water Works Association , 06/01/2001

Publisher: AWWA

File Format: PDF

$12.00$24.00


The Central Arizona Project (CAP) needed an estimate of its future capital replacement and refurbishment funding needs in order to assess the adequacy of its existing wholesale water rates and the appropriate reserve levels to maintain. To meet this need, a system replacement planning analysis was prepared to estimate CAP's future capital system replacement and refurbishment funding levels. A detailed inventory database approach utilized existing CAP capital facility records, original cost data, expected useful life estimates, and facility condition assessment data to determine future capital replacement needs.Interim results provided CAP with annual capital replacement and refurbishment estimates that were used to assess the adequacy of existing wholesale water rates and reserve levels. The results were also used to help inform and educate CAP's senior management, Board of Directors, and customers on future capital funding needs. Includes tables.

More AWWA Standards PDF

AWWA ACE58117

AWWA ACE58117

$12.00 $24.00

AWWA MTC57553

AWWA MTC57553

$12.00 $24.00

AWWA WQTC58810

AWWA WQTC58810

$12.00 $24.00

AWWA ACE58118

AWWA ACE58118

$12.00 $24.00