• AWWA ACE61635

AWWA ACE61635

Innovative Procurement Methods for Process Equipment at Water Treatment Facilities to Offset Escalating Construction Costs

American Water Works Association , 06/17/2005

Publisher: AWWA

File Format: PDF

$12.00$24.00


To offset the rapid increase in construction costs, CH2M HILL has successfully implemented innovative procurement methods to reduce the costs of major process equipment during the design of projects throughout the country. Three equipment procurement methods have been widely implemented: pre-negotiation, pre-bidding, and pre-purchasing. By identifying the key process equipment components and determining the preferred vendor for specific equipment items, negotiating, bidding, or purchasing the equipment prior to the bidding of the project can generate significant cost savings for the owner. Each of these equipment procurement methods has resulted in improving the efficiency and quality of the design and construction phases and in achieving the primary goal of controlling construction costs. Specifically, these innovative procurement methods have been utilized for obtaining the process equipment at the J.G. Beacham Water Treatment Plant (WTP) in Athens, Georgia, at the Rockdale County, Georgia, WTP, and at three WTPs in Clayton County, Georgia. This paper presents in detail the procurement methods employed for each of these projects. Includes 3 references, tables.

More AWWA Standards PDF

AWWA ACE58108

AWWA ACE58108

$12.00 $24.00

AWWA MTC57657

AWWA MTC57657

$12.00 $24.00

AWWA WQTC58800

AWWA WQTC58800

$12.00 $24.00

AWWA ACE58109

AWWA ACE58109

$12.00 $24.00