• AWWA ACE61782

AWWA ACE61782

Implementing the Ozonation Process into an Existing Large-Scale Water Treatment Plant

American Water Works Association , 06/17/2005

Publisher: AWWA

File Format: PDF

$12.00$24.00


The City of Fort Worth is expanding the Rolling Hills Water Treatment Plant from 160 mgd to 200 mgd capacity. As part of this expansion project, a 200-mgd raw water ozonation facility has been constructed and put into operation. Ozonation was selected to meet current and future regulatory requirements, reduce tastes and odors, and improve overall treated water quality. This paper presents a case study for implementing a new ozonation facility into an existing large-scale plant and addressing the issues and challenges with such a facility. Includes 3 references, tables, figures.

More AWWA Standards PDF

AWWA WQTC59011

AWWA WQTC59011

$12.00 $24.00

AWWA ACE58227

AWWA ACE58227

$12.00 $24.00

AWWA WSP57722

AWWA WSP57722

$12.00 $24.00

AWWA WQTC59012

AWWA WQTC59012

$12.00 $24.00