• AWWA ACE63085

AWWA ACE63085

Three Generations of Membranes in One Water Treatment Plant Over an Eight Year Period, and One More to Go, At Least for Now: The Raymond A. Barker Ultrafiltration Water Treatment Plant Experience

American Water Works Association , 06/01/2006

Publisher: AWWA

File Format: PDF

$12.00$24.00


This article discusses the performance of three generations of membranes in the Raymond A. Barker Ultrafiltration Water Treatment Plant (WTP) over the past eight years; the strategy for retrofitting two of the existing trains/basins with a completely different generation of membranes; and, the task commenced by the Collingwood Public Utilities (CPU) for researching and grouping the most permeable membrane modules from five trains to three trains. Includes tables, figures.

More AWWA Standards PDF

AWWA IMTECH59629

AWWA IMTECH59629

$12.00 $24.00

AWWA DSS60333

AWWA DSS60333

$12.00 $24.00

AWWA IMTECH59628

AWWA IMTECH59628

$12.00 $24.00

AWWA DSS60334

AWWA DSS60334

$12.00 $24.00