• AWWA ACE68788

AWWA ACE68788

Installing Ductile Iron Pipe Using Horizontal Directional Drilling

American Water Works Association , 11/01/2008

Publisher: AWWA

File Format: PDF

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of Horizontal Directional Drilling (HDD) and the HDD process including the following steps: Step 1 - pilot hole; Step 2 - ream; and, Step 3 - pull-back. HDD equipment is presented, along with HDD market analysis and market growth, HDD advantages and product materials, and design considerations. Three examples of using HDD technology are provided.

More AWWA Standards PDF

AWWA ACE58121

AWWA ACE58121

$12.00 $24.00

AWWA MTC57569

AWWA MTC57569

$12.00 $24.00

AWWA WQTC58814

AWWA WQTC58814

$12.00 $24.00

AWWA ACE58122

AWWA ACE58122

$12.00 $24.00