• AWWA ACE70624

AWWA ACE70624

Pilot Testing Pretreatment for the Country's (2nd) Largest Zero Liquid Discharge Membrane Treatment Facility

American Water Works Association , 11/01/2009

Publisher: AWWA

File Format: PDF

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of the 34 mgd David C. McCollom Water Treatment Plant (WTP) built in 2002, expanded in 2003, and its treatment process. Ultrafiltration (UF) system upgrades are presented, along with California Department of Public Health (CDPH) regulations, addition of tank drains, current plant performance, pilot testing, performance objectives, two source waters, enhanced pretreatment process, reduced pretreatment process, and test configuration. Presentation conclusions indicate the following: OMWD currently evaluating alternatives for plant improvements; full tank drains will improve water quality, allow maintenance cleans, and comply with regulations; extending backwash frequency to 3 hours was effective at improving recovery (to 93%) without long term performance impacts. Includes figures.

More AWWA Standards PDF

AWWA WQTC60697

AWWA WQTC60697

$12.00 $24.00

AWWA ACE59832

AWWA ACE59832

$12.00 $24.00

AWWA M14

AWWA M14

$57.00 $115.00

AWWA WQTC60696

AWWA WQTC60696

$12.00 $24.00