• AWWA DSS58692

AWWA DSS58692

Reservoir Rehabilitation or Demolition? How and Why the City of Huntington Beach Chose to do Both

American Water Works Association , 10/01/2003

Publisher: AWWA

File Format: PDF

$12.00$24.00


This paper explores the collaboration between City of Huntington Beach, California staff and the design team to develop innovative ideas to resolve difficult design, construction and operational issues for the Overmyer Reservoir Renovation Project in Huntington Beach, California. Includes tables.

More AWWA Standards PDF

AWWA WQTC55133

AWWA WQTC55133

$12.00 $24.00

AWWA ACE54487

AWWA ACE54487

$12.00 $24.00

AWWA WQTC55131

AWWA WQTC55131

$12.00 $24.00

AWWA ACE54488

AWWA ACE54488

$12.00 $24.00