• AWWA DSS65665

AWWA DSS65665

Optimizing Renewal Strategies for Water Networks

American Water Works Association , 09/01/2007

Publisher: AWWA

File Format: PDF

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of underground infrastructure management, followed by Mains Replacement Prioritization (MRP) that provides for an integrated view of pipe condition and related performance. A case study of mains replacement with the city of Atlanta, Georgia is presented. The benefits of the MRP approach include: provides an auditable approach to mains renewal; calibrated to match distribution system; configured to represent critical drivers for renewal decisions; can be easily enhanced as drivers change or more data becomes available; and, financial savings in renewal costs through project planning and by optimizing renewal effort. Includes figures.

More AWWA Standards PDF

B11 B11.19-2010

B11 B11.19-2010

$60.00 $120.00

AWWA B100-09

AWWA B100-09

$70.00 $140.00

AWWA JAW71584

AWWA JAW71584

$15.00 $30.00

AWWA JAW71581

AWWA JAW71581

$15.00 $30.00