• AWWA DSS69157

AWWA DSS69157

Central Feeder Pipeline Project

American Water Works Association , 11/01/2008

Publisher: AWWA

File Format: PDF

$12.00$24.00


This powerpoint presentation begins by presenting study objectives that include the following: relieve areas of high groundwater; and, provide additional water supply to Metropolitan Water District of Southern California. The project required meeting the requirements of two important regional clients, San Bernardino Valley Municipal Water District and Metropolitan Water District of Southern California. The overall project was implemented in a phased approach to meet Metropolitan's growing demands, and several key issues were resolved during preliminary design related to project water supply, hydraulics, and facilities development. Final design and construction was divided into 4 tasks: Task 1 - Phase 1A Pipeline and Intertie Vaults; Task 2 - Phase 1B Pipeline; Task 3 - Pump Station Design; and, Task 4 - Pump Station Construction.

More AWWA Standards PDF

AWWA DSS60335

AWWA DSS60335

$12.00 $24.00

AWWA IMTECH59626

AWWA IMTECH59626

$12.00 $24.00

AWWA DSS60336

AWWA DSS60336

$12.00 $24.00

AWWA IMTECH59625

AWWA IMTECH59625

$12.00 $24.00