• AWWA IMT61467

AWWA IMT61467

Proof-of-Concept: An Innovative Method for Choosing Software

American Water Works Association , 04/01/2005

Publisher: AWWA

File Format: PDF

$12.00$24.00


This slide presentation outlines information on the City of Henderson's (Nevada) LIMS procurement process. The paper provides an overview of the proof-of-concept methodology, and describes the benefits and challenges of using the proof-of-concept methodology. Topics covered include: LIMS project history; original project phases; proof-of-concept; adjusted project phases; proof-of-concept instrument interfacing, system parameters, phases, benefits, and drawbacks.

More AWWA Standards PDF

AWWA 51539

AWWA 51539

$12.00 $24.00

Pocket Ref

Pocket Ref

$11.00 $22.00

AWWA WQTC52749

AWWA WQTC52749

$12.00 $24.00

AWWA 51525

AWWA 51525

$12.00 $24.00