• AWWA MTC53871

AWWA MTC53871

From Pilot to Full-Scale Plant Start-Up: The Bexar Facility, Texas

American Water Works Association , 05/01/2001

Publisher: AWWA

File Format: PDF

$12.00$24.00


The Bexar Metropolitan Development Corporation has initiated a project at San Antonio,Texas. The DBO is a 9 mgd (34,000 m3/day) production capacity plant, which supplies250,000 inhabitants of San Antonio. United Water Services, Infilco Degr¿montInc. and Montgomery Watson have built the water treatment plant and will operate it for the next 20 years. Aqualifying pilot testing on site confirmed that the Superpulsator(R), a sludge blanket clarifierfrom Infilco Degr¿mont Inc., placed before the Aquasource UF membrane met the BexarMetropolitan Development Corporation's expectations in terms of water quality, reliabilityand cost effectiveness. Thus, the Aquasource UF membrane has been selected among threedifferent membrane suppliers. The facility was started in December 1999 as scheduled. Boththe client and the operator are satisfied with the 1st year of operation. This paper presents datafrom the pilot plant studies and the full-scale commissioning phase. Both water quality andoperational data are discussed. Includes 4 references, tables, figures.

More AWWA Standards PDF

AWWA JTMGT64465

AWWA JTMGT64465

$86.00 $173.05

AWWA ACE65420

AWWA ACE65420

$12.00 $24.00

AWWA ACE65087

AWWA ACE65087

$12.00 $24.00

AWWA JTMGT64428

AWWA JTMGT64428

$12.00 $24.00