• AWWA MTC57643

AWWA MTC57643

Requirements for Flocculation Followed by Ultrafiltration for Direct Treatment of Reservoir Water

American Water Works Association , 03/05/2003

Publisher: AWWA

File Format: PDF

$12.00$24.00


The Wasserwerk des Kreises Aachen in Roetgen, Germany operates with financial help of the German Ministry for Education and Research and with scientific support of the IWW (Muelheim/Germany) a large scale membrane pilot plant. This pilot is equipped with twelve 6 m long pressure vessels resulting in a membrane area of about 1620 m2 to produce about 150 m3/h of filtrate. The pilot plant is operated with flocculated reservoir water as feed. The results show that the residence time between dosing and ultrafiltration plant is important. To further investigate the requirements for flocculation a pipe flocculation was constructed and the length of the pipe systems was varied. Includes figures.

More AWWA Standards PDF

AWWA WQTC65885

AWWA WQTC65885

$12.00 $24.00

AWWA ACE65288

AWWA ACE65288

$12.00 $24.00

AWWA MTC64637

AWWA MTC64637

$104.00 $208.90

AWWA WQTC65807

AWWA WQTC65807

$12.00 $24.00