• AWWA MTC61138

AWWA MTC61138

Optimizing Existing Facilities

American Water Works Association , 03/01/2005

Publisher: AWWA

File Format: PDF

$12.00$24.00


This slide presentation outlines information on Cape Coral Utilities' plan to optimize their existing treatment facilities to satisfy increasing water demand due to population growth in the area. Topics covered include: Cape Coral buildout schedule; two focuses of water demand growth that included an interim increase in capacity at the existing plant of approximately 2MGD, and parallel North Plant capacity of 12MGD (including bypass) required to be operational in 2007; Cape Coral wellfields; projected water quality; existing plant descriptions; considered alternatives and impacts; blend stream; concentrate discharge; and, increasing existing plant capacity. Includes tables, figures.

More AWWA Standards PDF

AWWA ACE59875

AWWA ACE59875

$12.00 $24.00

AWWA JAW59501

AWWA JAW59501

$15.00 $30.00

AWWA WQTC60683

AWWA WQTC60683

$12.00 $24.00

AWWA ACE59876

AWWA ACE59876

$12.00 $24.00