• AWWA SOURCES66544

AWWA SOURCES66544

Bringing a Regional Surface Water Supply Project from Concept to Reality

American Water Works Association , 02/01/2008

Publisher: AWWA

File Format: PDF

$12.00$24.00


This powerpoint presentation presents a project that delivered treated Tuolumne River surface water (TID water rights), TID responsible for constructing and operating the project that wholesaled water to the California cities of Turlock, Modesto, Hughson, and Ceres. Project drivers included groundwater quality and drinking water standards, and project history is outlined. Current efforts include: Turlock approved first Drinking Water Agreement in Oct. 2005, followed by Ceres, Hughson, and Modesto; and, Design-Build contract included water treatment plants and pipelines. Requested flow rates, project operations, key components of regional water system, TID - infiltration gallery, raw water system, water treatment plant, pilot plant process design, finished water storage and pump station, water transmission, pipeline alignment, and city interconnections are all presented.

More AWWA Standards PDF

AWWA ACE70888

AWWA ACE70888

$12.00 $24.00

AWWA WQTC71360

AWWA WQTC71360

$12.00 $24.00

AWWA WQTC71453

AWWA WQTC71453

$12.00 $24.00

AWWA ACE70870

AWWA ACE70870

$12.00 $24.00