• AWWA WQTC69240

AWWA WQTC69240

Preparing for the Expected: Developing a Scenario Planning Matrix and Operational Strategy for Challenging Operational Conditions

American Water Works Association , 11/01/2008

Publisher: AWWA

File Format: PDF

$12.00$24.00


This powerpoint presentation presents a case study at the Union Hills Water Treatment Plant (UHWTP) on turbidity mitigation issues and strategies. A scenario planning matrix is provided, along with implementation of predictive technology, Turbidity Event Operating Strategies Guide (TEOSG). TEOSG Event Preparation, Chemical Dosing Strategy, Liquid Process Operational Strategy, Solids Handling Process Operations, and Close Out and Documentation are all outlined. Includes tables, figure.

More AWWA Standards PDF

AWWA ACE68642

AWWA ACE68642

$12.00 $24.00

AWWA C560-07

AWWA C560-07

$70.00 $140.00

AWWA ACE68564

AWWA ACE68564

$12.00 $24.00

AWWA JAW68943

AWWA JAW68943

$15.00 $30.00