BS PD IEC TR 60904-14:2020

Photovoltaic devices-Guidelines for production line measurements of single-junction PV module maximum power output and reporting at standard test conditions

BSI Group , 12/09/2020

Publisher: BS

File Format: PDF

$132.00$264.16


This document provides guidelines for measurements of the maximum power (Pmax) output ofsingle-junction photovoltaic (PV) modules and for reporting at standard test conditions (STC) inindustrial production line settings. Such measurements typically:

• Record current-voltage (I-V) data while illuminating the module with a solar simulator;• Are performed on 100 % of manufactured modules, in order to determine whether they meetnameplate requirements for various bins spanning different power output levels.

More BS Standards PDF

BS 06/30153859 DC

BS 06/30153859 DC

$137.00 $274.24

BS 06/30151320 DC

BS 06/30151320 DC

$93.00 $187.87

BS 06/30138827 DC

BS 06/30138827 DC

$128.00 $257.60

BS 06/30146693 DC

BS 06/30146693 DC

$83.00 $167.34