IEEE 2777-2021

IEEE Recommended Practice for Operation of 300 MW to 600 MW Pulverized Coal-Fired Boiler

IEEE , 04/30/2021

Publisher: IEEE

File Format: PDF

$46.00$93.00


IEEE 2777-2021 PDF

This recommended practice defines the principles and procedures for start-up, normal operation, shutdown, daily operation, and maintenance during normal and emergency conditions for a 300 MW to 600 MW pulverized coal-fired boiler and its main auxiliary equipment. This recommended practice applies to 300 MW to 600 MW pulverized coal-fired boilers with a balanced draft, including natural circulation and forced circulation; subcritical and supercritical once-through boilers; tangential-fired boilers; opposed-fired boilers; and so on. For specific applications, an additional document needs to be formulated by users based on this recommended practice to cover detailed procedures or normally so-called "operation code," together with the instructions of manufacturers and the experiences derived from normal operation practice. New IEEE Standard - Active. General technical recommended practice for operation of pulverized coal-fired boilers in power plants is provided, including start-up, shutdown, operation and maintenance, and emergency and failure detection/handling/prevention. In this document, a boiler with existing single units with a capacity of 300 MW to 600 MW in thermal power plants, where pulverized coal is combusted to generate electricity and/or to supply heat, is discussed. Development of boiler operation code as a reference to determine detailed operation steps and/or procedures for a particular boiler in the plant is outlined. The specifications of manufacturers, successful experiences from practice, and stipulations defined in other related high-level standards/regulations/codes are also considered.

More IEEE Standards PDF

SAE AS13441A

SAE AS13441A

$86.00 $173.00

SAE AS 55941/2

SAE AS 55941/2

$141.00 $282.08

SAE J 1393

SAE J 1393

$88.00 $176.03

SAE AS 55941

SAE AS 55941

$114.00 $228.09