• AWWA ACE65106

AWWA ACE65106

It Meets the Spec... Really!!

American Water Works Association , 06/01/2007

Publisher: AWWA

File Format: PDF

$12.00$24.00


This powerpoint presentation attempts to identify the problems associated with adding manufacturers after specifications have been developed, demonstrate how to modify a bad Bid Form, maintaining engineer and owner control, and present a real life project that the manufacturers got thrown under the bus and how it hurt the engineer in the long run. Recommendations include: have "me too" manufactures develop drawing and calculation submittal package to be evaluated prior to the bid; and, "want to be" named manufacturers should be required to review the specification line by line and make comments as to any discrepancies and explain the differences.

More AWWA Standards PDF

AWWA JAW56655

AWWA JAW56655

$15.00 $30.00

AWWA SOURCES55582

AWWA SOURCES55582

$12.00 $24.00

AWWA JAW56654

AWWA JAW56654

$15.00 $30.00

AWWA SOURCES55642

AWWA SOURCES55642

$12.00 $24.00