• AWWA DSS60336

AWWA DSS60336

Bringing a River Water Treatment Plant into Compliance Cost Effectively

American Water Works Association , 09/29/2004

Publisher: AWWA

File Format: PDF

$12.00$24.00


This slide presentation outlines information on a project to bring the City of East Moline Water Treatment Plant into compliance with the Interim Enhanced Surface Water Treatment Rule and the Disinfectants/Disinfection Byproducts Rule (D/DBPR). Other concerns included: meeting the requirements of future regulations such as the Filter Backwash Rule and the Stage 2 Microbial and D/DBPR, ensuring proper chemical pretreatment, ensuring proper rapid mix and flocculation, and reducing finished water turbidity. Topics covered include: seasonal water quality issues; historical water quality summary; site plan; improvements to raw water pumps, rapid mix basins, flocculation and sedimentation basins; alternative treatment technologies; estimate of probable construction costs; and, results of the effort.

More AWWA Standards PDF

AWWA MTC57581

AWWA MTC57581

$12.00 $24.00

AWWA WQTC58933

AWWA WQTC58933

$12.00 $24.00

AWWA ACE58260

AWWA ACE58260

$12.00 $24.00

AWWA MTC57554

AWWA MTC57554

$12.00 $24.00