• AWWA WQTC64168

AWWA WQTC64168

Take 2 at MPU: What a Difference 7 Years Made in the Design of Two Large-Scale Membrane Plants at Manitowoc Public Utilities

American Water Works Association , 11/01/2006

Publisher: AWWA

File Format: PDF

$12.00$24.00


This slide presentation outlines a case study at the Manitowoc (Wisconsin) Public Utilities (MPU) concerning the design of two large-scale membrane treatment plants. The presentation outline includes: Background and History; Existing Membrane Facility at MPU; New Membrane Facility; and, Improvements Over Past Facilities. Conclusions indicate that: new 25 mgd submerged MF plant in Manitowoc will provide existing and projected water needs for newly formed Central Brown County Water Authority; existing microfiltration (MF) facility state-of-the-art in 1999, breaking new ground in terms of cost and schedule; rapid changes in industry over last 7 years have allowed for drastic improvements in cost, space requirements, and operability at new facility; and, as the industry continues to develop it provides new opportunities for utilities considering the use of membrane technologies.

More AWWA Standards PDF

AWWA WQTC60638

AWWA WQTC60638

$12.00 $24.00

AWWA ACE59975

AWWA ACE59975

$12.00 $24.00

AWWA SOURCES59268

AWWA SOURCES59268

$12.00 $24.00

AWWA WQTC60637

AWWA WQTC60637

$12.00 $24.00