IEC 62382 Ed. 1.0 en:2006

Electrical and instrumentation loop check

International Electrotechnical Commission , 11/15/2006

Publisher: IEC

File Format: PDF

$58.00$116.00


describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. Is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter).

IEC 62382 Ed. 1.0 en:2006 History

IEC 62382 Ed. 3.0 b:2024

IEC 62382 Ed. 3.0 b:2024

$122.00 $245.00

IEC 62382 Ed. 2.0 b:2012

IEC 62382 Ed. 2.0 b:2012

$95.00 $190.00

IEC 62382 Ed. 1.0 en:2006

IEC 62382 Ed. 1.0 en:2006

$58.00 $116.00

More IEC Standards PDF

IEC 62485-3 Ed. 2.0 b:2014
IEC 62290-1 Ed. 2.0 b:2014

IEC 62290-1 Ed. 2.0 b:2014

$139.00 $278.00

IEEE C57.12.28-2014

IEEE C57.12.28-2014

$40.00 $81.00

IEC 62695 Ed. 1.0 b:2014

IEC 62695 Ed. 1.0 b:2014

$183.00 $367.00