• IEEE 1267-1999

IEEE 1267-1999

IEEE Guide for Development of Specification for Turnkey Substation Projects

IEEE , 12/30/1999

Publisher: IEEE

File Format: PDF

$63.00$127.00


The scope of this guide is to investigate the methods, practices, and requirements of both users and suppliers, and to promogate a systematic and coordinated approach for development of specifications for turnkey substation projects. The purpose of this guide is to develop, for producers and users, methods and procedures for formulating complete specifications for turnkey substations or projects. New IEEE Standard - Superseded. The technical requirements to engineer, design, specify, fabricate, manufacture, furnish,install, test, commission, and provide as-built documents for air-insulated substations are covered.This guide investigates the methods, practices, and requirements of both users and suppliers in order to promogate a systematic and coordinated approach for development of specifications for turn-key substation projects.

IEEE 1267-1999 History

IEEE 1267-2019

IEEE 1267-2019

$53.00 $106.00

IEEE 1267-1999

IEEE 1267-1999

$63.00 $127.00

More IEEE Standards PDF

IEC 61784-5-19 Ed. 1.0 b:2013
IEC 61753-051-3 Ed. 2.0 b:2013
IEC 62395-2 Ed. 1.0 b:2013

IEC 62395-2 Ed. 1.0 b:2013

$208.00 $417.00

IEC 60947-2 Ed. 4.2 b:2013

IEC 60947-2 Ed. 4.2 b:2013

$423.00 $847.00